Toolpack:Optional configurations for SPIROU A
From TBwiki
(Difference between revisions)
m (Changed title of section for Transit Network Selection) |
(Added section for manual continuity check) |
||
Line 4: | Line 4: | ||
Depending on the series of tests defined for the SPIROU certification, some additional steps might be required. | Depending on the series of tests defined for the SPIROU certification, some additional steps might be required. | ||
+ | |||
+ | |||
+ | If a manual continuity check (CCR) is required '''(ART/ST/NRT/7-99/ed2.1 :: 4.2-1)''': | ||
+ | *[[Toolpack:Starting_Continuity_Check_ISUP_A|Starting a continuity check on a circuit]] | ||
Revision as of 09:37, 14 December 2012
Applies to version(s): v2.6, v2.7.
Depending on the series of tests defined for the SPIROU certification, some additional steps might be required.
If a manual continuity check (CCR) is required (ART/ST/NRT/7-99/ed2.1 :: 4.2-1):
If Overlap dialing is tested ( ART/ST/NRT/7-99/ed2.1 :: 4.3.1-7a ) :
If Transit Network Selection is required ( ART/ST/NRT/7-99/ed2.1 :: 4.3.5 ):