Toolpack:Optional configurations for SPIROU A

From TBwiki
(Difference between revisions)
Jump to: navigation, search
m (Changed title of section for Transit Network Selection)
(Added section for manual continuity check)
Line 4: Line 4:
  
 
Depending on the series of tests defined for the SPIROU certification, some additional steps might be required.
 
Depending on the series of tests defined for the SPIROU certification, some additional steps might be required.
 +
 +
 +
If a manual continuity check (CCR) is required '''(ART/ST/NRT/7-99/ed2.1 :: 4.2-1)''':
 +
*[[Toolpack:Starting_Continuity_Check_ISUP_A|Starting a continuity check on a circuit]]
  
  

Revision as of 09:37, 14 December 2012

Applies to version(s): v2.6, v2.7.

Depending on the series of tests defined for the SPIROU certification, some additional steps might be required.


If a manual continuity check (CCR) is required (ART/ST/NRT/7-99/ed2.1 :: 4.2-1):


If Overlap dialing is tested ( ART/ST/NRT/7-99/ed2.1 :: 4.3.1-7a ) :


If Transit Network Selection is required ( ART/ST/NRT/7-99/ed2.1 :: 4.3.5 ):

Personal tools