Continuity Testing Call Flow (CCR/COT)

From TBwiki
(Difference between revisions)
Jump to: navigation, search
Line 12: Line 12:
 
Peer SP                                        TMG
 
Peer SP                                        TMG
  
CCR            - - - - - - - - - - ->           
+
CCR            --------------------->           
  
Check tone    - - - - - - - - - - -|        (timeslot loopbak)     
+
Check tone    ---------------------|        (timeslot loopbak)     
                 - - - - - - - - - -
+
                 -------------------
  
REL            - - - - - - - - - - ->
+
REL            --------------------->
  
               < -- - - - - - - - - -          RLC
+
               <---------------------          RLC
 
</pre>
 
</pre>
  
Line 26: Line 26:
 
Peer SP                                        TMG
 
Peer SP                                        TMG
  
CCR            - - - - - - - - - - ->  
+
CCR            --------------------->  
  
               < -- - - - - - - - - -          LPA
+
               <---------------------          LPA
  
Check tone    - - - - - - - - - - -|        (timeslot loopbak)     
+
Check tone    ---------------------|        (timeslot loopbak)     
                 - - - - - - - - - -
+
                 -------------------
  
REL            - - - - - - - - - - ->
+
REL            --------------------->
  
               < -- - - - - - - - - -         RLC
+
               <---------------------        RLC
 
</pre>
 
</pre>
  
Line 45: Line 45:
 
Peer SP                                        TMG
 
Peer SP                                        TMG
  
IAM          - - - - - - - - - - ->
+
IAM          --------------------->
  
Check tone    - - - - - - - - - - -|          (timeslot loopbak)   
+
Check tone    ---------------------|          (timeslot loopbak)   
               - - - - - - - - - - -
+
               ---------------------
  
COT (successful) - - - - - - - - -->
+
COT (successful)------------------->
  
             <- - - - - - - - - - -            ACM
+
             <---------------------            ACM
 
   
 
   
             - - - - - - - - - - -            Ringing tone
+
             ---------------------            Ringing tone
  
             <- - - - - - - - - - -            ANM
+
             <---------------------            ANM
  
Connectivity - - - - - - - - - -           Connectivity
+
Connectivity ---------------------            Connectivity
  
REL          - - - - - - - - - - ->
+
REL          --------------------->
  
             <- - - - - - - - - - - RLC
+
             <---------------------            RLC
 
</pre>
 
</pre>
  
Line 72: Line 72:
  
 
Peer SP                                        TMG
 
Peer SP                                        TMG
             < - - - - - - - - - - -            CCR
+
             < ---------------------            CCR
  
             |- - - - - - - - - - -            Check tone
+
             |---------------------            Check tone
               - - - - - - - - - -
+
               ------------------
  
             < - - - - - - - - - - -            REL  
+
             < ---------------------            REL  
  
RLC          -- - - - - - - - - - ->     
+
RLC          ---------------------->     
 
</pre>     
 
</pre>     
  
 
== Configuration ==
 
== Configuration ==
 
*[[Outgoing COT testing|Web Portal v2.7: Outgoing Continuity Testing]]
 
*[[Outgoing COT testing|Web Portal v2.7: Outgoing Continuity Testing]]

Revision as of 15:55, 24 April 2014

Continuity tests are used to make sure that the SS7 ISUP interface circuit groups (CIC) are aligned with the physical links (E1/T1) properly. Toolpack version 2.7 allows users of the TMG to do ISUP Continuity Testing via 3 methods by CIC Group or individual CIC:

Contents

Incoming Continuity Testing Outside A Call

This circuit testing occurs when one of the nodes wants to validate a currently idle circuit. It is recommended that the switch first blocks the circuit to prevent calls to use the circuit during the testing.

A successful test call flow is as below:

For ITU:

Peer SP                                        TMG

CCR            --------------------->          

Check tone     ---------------------|         (timeslot loopbak)    
                -------------------

REL            --------------------->

               <---------------------          RLC

For ANSI:

Peer SP                                        TMG

CCR            ---------------------> 

               <---------------------          LPA

Check tone     ---------------------|         (timeslot loopbak)     
                -------------------

REL            --------------------->

               <---------------------         RLC

Incoming Continuity Testing Within A Call

This circuit testing occurs when the forward side (originating side) sets the ‘continuity test required’ field of the ‘nature of connection indicators’ IE into the IAM message.

A successful test call flow is as below:

Peer SP                                        TMG

IAM           --------------------->

Check tone    ---------------------|          (timeslot loopbak)  
              ---------------------

COT (successful)------------------->

             <---------------------            ACM
 
             ---------------------             Ringing tone

             <---------------------            ANM

Connectivity ---------------------             Connectivity

REL          --------------------->

             <---------------------            RLC

Outgoing Continuity Testing

Users of the TMG unit can generate out of call SS7 ISUP Continuity Tests via webportal easily.

A successful test call flow is as below:


Peer SP                                        TMG
            < ---------------------            CCR

            |---------------------             Check tone
              ------------------

            < ---------------------            REL 

RLC          ---------------------->    

Configuration

Personal tools