Continuity Testing Call Flow (CCR/COT)
Nicole Tan (Talk | contribs) (Corrected a typo) |
Nicole Tan (Talk | contribs) (Replaced COT by Continuity) |
||
Line 2: | Line 2: | ||
Toolpack version 2.7 allows users of the TMG to do ISUP Continuity Testing via 3 methods by CIC Group or individual CIC: | Toolpack version 2.7 allows users of the TMG to do ISUP Continuity Testing via 3 methods by CIC Group or individual CIC: | ||
− | == Incoming Continuity | + | == Incoming Continuity Testing Outside A Call == |
This circuit testing occurs when one of the nodes wants to validate a currently idle circuit. | This circuit testing occurs when one of the nodes wants to validate a currently idle circuit. | ||
It is recommended that the switch first blocks the circuit to prevent calls to use the circuit during the testing. | It is recommended that the switch first blocks the circuit to prevent calls to use the circuit during the testing. | ||
Line 27: | Line 27: | ||
</pre> | </pre> | ||
− | == Incoming Continuity | + | == Incoming Continuity Testing Within A Call == |
This circuit testing occurs when the forward side (originating side) sets the ‘continuity test required’ field of the ‘nature of connection indicators’ IE into the IAM message. | This circuit testing occurs when the forward side (originating side) sets the ‘continuity test required’ field of the ‘nature of connection indicators’ IE into the IAM message. | ||
− | A successful | + | A successful Test Callflow is as below: |
<pre> | <pre> | ||
Peer SP TMG | Peer SP TMG | ||
Line 44: | Line 44: | ||
</pre> | </pre> | ||
− | == Outgoing | + | == Outgoing Continuity Testing == |
Users of the TMG unit can generate out of call SS7 ISUP Continuity Tests via webportal easily. | Users of the TMG unit can generate out of call SS7 ISUP Continuity Tests via webportal easily. | ||
− | A successful | + | A successful Test Callflow is as below: |
<pre> | <pre> | ||
Peer SP TMG | Peer SP TMG | ||
Line 57: | Line 57: | ||
== Configuration == | == Configuration == | ||
− | *[[Outgoing COT testing|Web Portal v2.7: Outgoing | + | *[[Outgoing COT testing|Web Portal v2.7: Outgoing Continuity Testing]] |
Revision as of 14:23, 24 April 2014
Continuity tests are used to make sure that the SS7 ISUP interface circuit groups (CIC) are aligned with the physical links (E1/T1) properly. Toolpack version 2.7 allows users of the TMG to do ISUP Continuity Testing via 3 methods by CIC Group or individual CIC:
Contents |
Incoming Continuity Testing Outside A Call
This circuit testing occurs when one of the nodes wants to validate a currently idle circuit. It is recommended that the switch first blocks the circuit to prevent calls to use the circuit during the testing. A successful COT Test Callflow is as below: For ITU:
Peer SP TMG CCR - - - - - - - - - - -> Check tone - - - - - - - - - - -| - - - - - - - - - - REL - - - - - - - - - - -> < -- - - - - - - - - - RLC
For ANSI:
Peer SP TMG CCR - - - - - - - - - - -> < -- - - - - - - - - - LPA Check tone - - - - - - - - - - -| - - - - - - - - - - REL - - - - - - - - - - -> < -- - - - - - - - - - RLC
Incoming Continuity Testing Within A Call
This circuit testing occurs when the forward side (originating side) sets the ‘continuity test required’ field of the ‘nature of connection indicators’ IE into the IAM message. A successful Test Callflow is as below:
Peer SP TMG IAM - - - - - - - - - - -> Check tone - - - - - - - - - - -| - - - - - - - - - - - COT (successful) - - - - - - - - --> <- - - - - - - - - - - ACM - - - - - - - - - - - Ringing tone <- - - - - - - - - - - ANM Connectivity - - - - - - - - - - Connectivity REL - - - - - - - - - - -> <- - - - - - - - - - - RLC
Outgoing Continuity Testing
Users of the TMG unit can generate out of call SS7 ISUP Continuity Tests via webportal easily. A successful Test Callflow is as below:
Peer SP TMG < - - - - - - - - - - - CCR |- - - - - - - - - - - Check tone - - - - - - - - - - < - - - - - - - - - - - REL RLC -- - - - - - - - - - ->