Continuity Testing Call Flow (CCR/COT)
Nicole Tan (Talk | contribs) |
Nicole Tan (Talk | contribs) |
||
| Line 11: | Line 11: | ||
<pre> | <pre> | ||
Peer SP TMG | Peer SP TMG | ||
| + | |||
CCR - - - - - - - - - - -> | CCR - - - - - - - - - - -> | ||
| + | |||
Check tone - - - - - - - - - - -| (timeslot loopbak) | Check tone - - - - - - - - - - -| (timeslot loopbak) | ||
- - - - - - - - - - | - - - - - - - - - - | ||
| + | |||
REL - - - - - - - - - - -> | REL - - - - - - - - - - -> | ||
| + | |||
< -- - - - - - - - - - RLC | < -- - - - - - - - - - RLC | ||
</pre> | </pre> | ||
| Line 21: | Line 25: | ||
<pre> | <pre> | ||
Peer SP TMG | Peer SP TMG | ||
| + | |||
CCR - - - - - - - - - - -> | CCR - - - - - - - - - - -> | ||
| + | |||
< -- - - - - - - - - - LPA | < -- - - - - - - - - - LPA | ||
| + | |||
Check tone - - - - - - - - - - -| (timeslot loopbak) | Check tone - - - - - - - - - - -| (timeslot loopbak) | ||
- - - - - - - - - - | - - - - - - - - - - | ||
| + | |||
REL - - - - - - - - - - -> | REL - - - - - - - - - - -> | ||
| + | |||
< -- - - - - - - - - - RLC | < -- - - - - - - - - - RLC | ||
</pre> | </pre> | ||
| Line 35: | Line 44: | ||
<pre> | <pre> | ||
Peer SP TMG | Peer SP TMG | ||
| + | |||
IAM - - - - - - - - - - -> | IAM - - - - - - - - - - -> | ||
| − | Check tone - - - - - - - - - - -| | + | |
| + | Check tone - - - - - - - - - - -| (timeslot loopbak) | ||
- - - - - - - - - - - | - - - - - - - - - - - | ||
| + | |||
COT (successful) - - - - - - - - --> | COT (successful) - - - - - - - - --> | ||
| + | |||
<- - - - - - - - - - - ACM | <- - - - - - - - - - - ACM | ||
| − | + | ||
| + | - - - - - - - - - - - Ringing tone | ||
| + | |||
<- - - - - - - - - - - ANM | <- - - - - - - - - - - ANM | ||
| + | |||
Connectivity - - - - - - - - - - Connectivity | Connectivity - - - - - - - - - - Connectivity | ||
| + | |||
REL - - - - - - - - - - -> | REL - - - - - - - - - - -> | ||
| + | |||
<- - - - - - - - - - - RLC | <- - - - - - - - - - - RLC | ||
</pre> | </pre> | ||
| Line 52: | Line 70: | ||
A successful test call flow is as below: | A successful test call flow is as below: | ||
<pre> | <pre> | ||
| + | |||
Peer SP TMG | Peer SP TMG | ||
< - - - - - - - - - - - CCR | < - - - - - - - - - - - CCR | ||
| + | |||
|- - - - - - - - - - - Check tone | |- - - - - - - - - - - Check tone | ||
- - - - - - - - - - | - - - - - - - - - - | ||
| + | |||
< - - - - - - - - - - - REL | < - - - - - - - - - - - REL | ||
| + | |||
RLC -- - - - - - - - - - -> | RLC -- - - - - - - - - - -> | ||
</pre> | </pre> | ||
Revision as of 15:49, 24 April 2014
Continuity tests are used to make sure that the SS7 ISUP interface circuit groups (CIC) are aligned with the physical links (E1/T1) properly. Toolpack version 2.7 allows users of the TMG to do ISUP Continuity Testing via 3 methods by CIC Group or individual CIC:
Contents |
Incoming Continuity Testing Outside A Call
This circuit testing occurs when one of the nodes wants to validate a currently idle circuit. It is recommended that the switch first blocks the circuit to prevent calls to use the circuit during the testing.
A successful test call flow is as below:
For ITU:
Peer SP TMG
CCR - - - - - - - - - - ->
Check tone - - - - - - - - - - -| (timeslot loopbak)
- - - - - - - - - -
REL - - - - - - - - - - ->
< -- - - - - - - - - - RLC
For ANSI:
Peer SP TMG
CCR - - - - - - - - - - ->
< -- - - - - - - - - - LPA
Check tone - - - - - - - - - - -| (timeslot loopbak)
- - - - - - - - - -
REL - - - - - - - - - - ->
< -- - - - - - - - - - RLC
Incoming Continuity Testing Within A Call
This circuit testing occurs when the forward side (originating side) sets the ‘continuity test required’ field of the ‘nature of connection indicators’ IE into the IAM message.
A successful test call flow is as below:
Peer SP TMG
IAM - - - - - - - - - - ->
Check tone - - - - - - - - - - -| (timeslot loopbak)
- - - - - - - - - - -
COT (successful) - - - - - - - - -->
<- - - - - - - - - - - ACM
- - - - - - - - - - - Ringing tone
<- - - - - - - - - - - ANM
Connectivity - - - - - - - - - - Connectivity
REL - - - - - - - - - - ->
<- - - - - - - - - - - RLC
Outgoing Continuity Testing
Users of the TMG unit can generate out of call SS7 ISUP Continuity Tests via webportal easily.
A successful test call flow is as below:
Peer SP TMG
< - - - - - - - - - - - CCR
|- - - - - - - - - - - Check tone
- - - - - - - - - -
< - - - - - - - - - - - REL
RLC -- - - - - - - - - - ->