Starting Manual Continuity Check

From TBwiki
Revision as of 10:17, 14 December 2012 by Manon Bélanger (Talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Applies to version(s): v2.6, v2.7.

Note: the option might not be available if the resources required for the test (tone generation and detection) are not available.


1- Select SS7->ISUP from the navigation panel

2- Click on the Status tab and click on the appropriate ISUP Stack

3- Click on the Interfaces tab and select the appropriate ISUP Interface

4- Click on the Circuit Groups tab and select the appropriate Circuit Group


If you want to start a continuity check on all circuits of a circuit group:

  • Select Yes forStart continuity check and click on Apply states
  • Click on Now to refresh the status and see the result of the test. Some of the following stats should be modified:
    • Total ccr success cnt
    • Total ccr fail cnt
    • Last ccr unknown cnt
    • Last ccr in progress cnt
    • Last ccr success cnt
    • Last ccr fail cnt
    • Last ccr error cnt


If you want to start a continuity check on a specific circuit:

  • Click on the Circuits tab and select the circuit in the Cic column.
  • Select Yes forStart continuity check and click on Apply states
  • Click on Now to refresh the status and see the result of the test. Some of the following stats should be modified:
    • Nb outgoing ccr success
    • Nb outgoing ccr fail
    • Last ccr result
Personal tools