Starting Manual Continuity Check
From TBwiki
Revision as of 10:17, 14 December 2012 by Manon Bélanger (Talk | contribs)
Applies to version(s): v2.6, v2.7.
Note: the option might not be available if the resources required for the test (tone generation and detection) are not available.
1- Select SS7->ISUP from the navigation panel
2- Click on the Status tab and click on the appropriate ISUP Stack
3- Click on the Interfaces tab and select the appropriate ISUP Interface
4- Click on the Circuit Groups tab and select the appropriate Circuit Group
If you want to start a continuity check on all circuits of a circuit group:
- Select Yes forStart continuity check and click on Apply states
- Click on Now to refresh the status and see the result of the test. Some of the following stats should be modified:
- Total ccr success cnt
- Total ccr fail cnt
- Last ccr unknown cnt
- Last ccr in progress cnt
- Last ccr success cnt
- Last ccr fail cnt
- Last ccr error cnt
If you want to start a continuity check on a specific circuit:
- Click on the Circuits tab and select the circuit in the Cic column.
- Select Yes forStart continuity check and click on Apply states
- Click on Now to refresh the status and see the result of the test. Some of the following stats should be modified:
- Nb outgoing ccr success
- Nb outgoing ccr fail
- Last ccr result