Toolpack major upgrades 2-4

From TBwiki
Revision as of 11:19, 6 August 2010 by Cbilodeau (Talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

This page is the procedure migrate a Toolpack 2-3 system to a Toolpack 2-4 system.

Warning: Major upgrades require service interruption.

Contents

Stop Toolpack Service

 tbtoolpack stop

Run Toolpack Installer

Toolpack Installer

Copy the license

If not already done with the installation copy the license in the licenses directory

 [InstallDirectory]/pkg/licenses/

ex.

 /lib/tb/toolpack/pkg/licenses/
 C:\TelcoBridges\toolpack\pkg\licenses

Modify tbtoolpack service configuration

Doing this will enable the service to start with the new major version.

Modify this file:

 /lib/tb/toolpack/setup/[SystemId]/service/config.txt

and this line:

 application= /lib/tb/toolpack/setup/[SystemId]/[MajorVersion]/apps/tboamapp/tboamapp_wd_cfg.ini

For example:

 vi /lib/tb/toolpack/setup/12358/service/config.txt
 application= /lib/tb/toolpack/setup/12358/2.4/apps/tboamapp/tboamapp_wd_cfg.ini


Start Toolpack Service

 tbtoolpack start
Personal tools