MTP2:Timers

From TBwiki
Jump to: navigation, search

A total of 6 timers can be set as part of the common link configuration process. They are as follows (with definitions):


Timer Description
T1 Timer Alignment ready timer (the same as TTC JT-Q.703 remote verification in progress timer). Typical value is 40000 milliseconds (40 seconds) for ITU and 13000 milliseconds (13 seconds) for ANSI.
T2 Timer Not aligned timer (the same as TTC JT-Q.703 wait for remote startup in progress timer). Typical value is 5000 milliseconds (5 seconds) for ITU and 11800 milliseconds (11.8 seconds) for ANSI.
T3 Timer Aligned timer (the same as TTC JT-Q.703 initialization in progress timer). Typical value is 1500 milliseconds (1.5 seconds) for ITU and 11800 milliseconds (11.8 seconds) for ANSI.
T5 Timer Sending SIB timer. Typical value is 100 milliseconds (0.1 second).
T6 Timer Remote congestion timer. Typical value is 3000 milliseconds (3 seconds).
T7 Timer Excessive delay of acknowledgment timer. Typical value is 1000 milliseconds (1 second).


NOTE: For all timers, a value of '0' is not permitted. Also, please note that there is no T4 Timer.


Screenshot

The following screenshot shows the fields for configuring timers in the MTP2 link configuration process.


MTP2-link-configuration-timers.jpg

Personal tools