SS7 User's Guide
The following is taken from the SS& User's Guide of September 2008. Not all content has been ported to the wiki, specifically elements that deal with Toolpack API need to be revised before they can be ported. In some cases, some of the links below point to articles that were already on the wiki. For example, as part of the Web Portal Tutorial Guide. In this case, we have merged articles from both sources to the best of our ability.
Where practical, we have also provided links to articles from the SS7 User's guide in the form of 'related actions' or 'references' that can be found at the bottom of various topical pages, such as those found in the 'glossary' available via the left-hand navigation bar on each wiki page.
Contents |
SS7 User's Guide
MTP2
- Overview
- MTP2 Configuration (THERE ARE SOME PARAMETERS MISSING)
- MTP2 States
- Statistics
MTP3
- Overview (NEED TO UDPATE LINKED PAGE WITH CONTENT FROM SS7 USER GUIDE)
- Architecture (PAGE CONTENT IS INCOMPLETE; NEED TO REVISE GRAPHICS)
- Specification
- MTP3 Configuration
- Configuration of layer (this may not be required; could be API specific; clean up language)
- Link Alarms
- Linkset Alarms
- Route Alarms
- MTP3 States (SHOULD PROBABLY GET SCREENSHOTS LIKE FOR MTP2)
- MTP3 Statistics
ISUP
- Overview (NEED TO FIND A HOME FOR ALL OF THE HISTORY AT BEGINNING OF SECTION]]
- ISUP summary
- Architecture
- Configuration sequence
- Specification
- ISUP Configuration
- Layout of the ISUP network
- Configuration of layer
- General configuration
- Network
- Userpart
- Interface
- Circuits (need to clean up; also, what is the equivalent section in the Web portal tutorial guide?)
- ISUP Signaling
- Host application requirements
- General guidelines for designing an efficient call control application using ISUP
- General guidelines for designing highly redundant application (blade failure)
- General guidelines for designing a high-performance system
- General guidelines to have highly redundant high-performance system (host failure)
- Information element usage
- ISUP functions and behaviours
- Blocking and unblocking
- Circuit group functions
- Flow control
- Circuit continuity testing (VALIDATE THE CODING REFERENCES AS WELL AS WORD REFERENCES)
- Host application requirements
SCCP
TCAP
- Overview
- Architecture (MISSING 2 IMAGES)
- Specification
- TCAP Configuration
- TCAP Transaction
- TCAP Alarms
- TCAP States
- TCAP Statistics
Caveat
The signaling information/code contained in this document/product is based on the best information we have available. Although it has been tested successfully with other piece of signaling equipment, we cannot guarantee that it will conform to the usage of any particular switch in the field.